GET 30% OFF ON TERMITE CONTROL SERVICE

Pre-Construction


Pre - Construction Treatment


If you are planning to build a house or develop your property ,than preconstruction pest control treatment is the first thing you should think of. We use highly professional and advanced techniques for treating the termite infestation problem. Direct liquid treatments are applied to the outside, inside and also in the foundation to eliminate the termites completely. Direct injection of liquid pesticide (termiticide) in areas like the foundation, within the foundation walls and also areas under the concrete slabs is part of our specialized termite control treatment plan.


Pre-Construction Termite Treatment Stages:


  • We treat the sides and bottom surface of the foundation trenches and pits with chemical to a height of about 30cm at the rate of 5 Lit. per square meter of surface area.
  • Backfill earth on each side of all built up walls, which will be in immediate contact with the foundation, should be treated with chemical at the rate of 7.5Lit. per linear meter of vertical surface of the substructure, to a depth of 45cm and width of 15cm.
  • The chemical shall be directed towards the masonry surfaces so that earth in contact with these surfaces is well treated with the chemical.
  • Before laying the floor, treat the top surface of the consolidated earth within the plinth walls with chemical at the rate of 5lit. per square meter. Ensure back fill against foundation is treated to its full depth.
  • Builders should take care that any disruption of the barrier during later construction work (e.g. creation of gardens over the treated barrier), may lead to untreated gaps.